S.04 · Land development & hydraulic infrastructure
Land development and hydraulic infrastructure in Jalisco and the surrounding region
Roads, water mains, sanitary and storm sewers, manholes and sidewalks. SIAPA works for towers, hospitals and developments in Providencia, Country Club and Valle Real.
- Los Ruiseñores 17 ha (Dynamica)
- El Sereno
- Puertas del Ángel
- Torre Punto / Río de Janeiro / ME / Principia Living / Sansalud (SIAPA)

- published projects
- 14
- hectares developed
- 17
- contracts with published numbers
- 2
Who it is for
- 01
Housing developers building in stages who must hand over utilities to the water authority.
- 02
Retail and park developers who need roads, utilities and detention basins.
- 03
Tower and hospital developers who must renew water and sewer lines with SIAPA before operating.
What's included
- Earthworks and road shaping
- Water mains and service connections
- Sanitary and storm sewers, manholes and valve boxes
- Stormwater detention basins
- Concrete pavements
- Sidewalks, curbs and street furniture
- Pavement removal and replacement for utility connections
- Technical coordination with SIAPA and the municipality
OBRA VIVA
How we build it, stage by stage
Every service follows the OBRA VIVA method: eight stages with verifiable deliverables.
- Stage 01
Layout
Road layout, lot staking and grade levels.
- Stage 02
Earthworks
Cut, fill and road sub-base.
- Stage 06
Utilities
Water, sanitary and storm sewers with manholes, boxes and testing.
- Stage 07
Roads and sidewalks
Concrete pavements, curbs, sidewalks and street furniture.
- Stage 08
Handover
Final tests, as-built drawings and handover to the utility.
Indicative range
How much does it cost? Reference per unit
| Level | per hectare | Example: 2 hectare |
|---|---|---|
| Standard | MX$10,000,000 – MX$30,000,000 | MX$20,000,000 – MX$60,000,000 |
Indicative, subject to engineering design and site visit. Direct cost in the Guadalajara metro area: excludes land, design, permits and VAT; a regional factor applies in the rest of Jalisco and in other states. Parameters version 2026.10. Roads, water, sewer, power, lighting and sidewalks per gross hectare [E].
Calculate my rangeTests and deliverables
- Schedule by stage
- Hydrostatic and tightness tests of utility lines
- Compaction and concrete tests
- As-built drawings of utilities and roads
- Handover documentation for SIAPA or the municipality
Applicable regulations
- Urban Code of the State of Jalisco
- SIAPA technical guidelines and specifications
- CONAGUA standards for water and sewer networks
- NOM-031-STPS (trenching and site safety)
Projects in this service

Los Ruiseñores subdivision: 17-hectare site development (first stage)
Dynamica

Sewer and water main rehabilitation in Colomos Providencia, Country Club and La Estancia
SIAPA

Torre Río de Janeiro: SIAPA hydraulic infrastructure
Grose Infraestructura / SIAPA

Reference image: similar project by Constructora Elite
Sansalud Valle Real hospital: SIAPA hydraulic infrastructure
Sansalud / SIAPA

Los Ruiseñores subdivision: site development, stages 7-A and 7-B
Dynamica

Reference image: similar project by Constructora Elite
Puertas del Ángel subdivision: 4th-stage site development (south field)
Related guides
8 min
Permits and licenses to build in Zapopan and the Guadalajara metro area
From land use to occupancy: the rulings, permits and feasibility approvals an industrial or commercial project needs in the Guadalajara metro area, the order in which to request them and how long they usually take.
8 min
The 8 stages of an industrial project: from clearing to handover
What happens in each stage of building a plant or warehouse, which deliverables you should receive and what can go wrong if a stage is skipped or rushed.
Frequently asked questions
Complementary services
Quote this service with an engineer.
Free site visit within 48 hours and an itemized proposal with schedule.