How we work from start to finish: the 8 stages of a project

The home page builds itself as you scroll, in the same order we work. Here is every stage explained: what we do, what you receive, who takes part and how long it usually takes.

  1. Earthworks platform at sunset with a water truck

    Stage 01

    Clearing and layout

    Survey, layout and site clearing with our own fleet.

    What happens

    We survey the site, set the boundary and design levels, remove topsoil or unsuitable material and leave the lot ready for cut and fill. This is where the quantities behind the budget are confirmed.

    Deliverables

    • Topographic survey and axis layout
    • Cut-and-fill quantities
    • Cleared site with hauling records

    Who takes part

    • Survey
    • Grader and dump-truck operators
    • Resident engineer

    Typical time

    Days to a few weeks, depending on area and access. · General range; depends on scope.

    Real data 17 ha developed at Los Ruiseñores (Tala) for Dynamica.

    Services:Earthworks & site grading Demolition & debris removal

  2. CAT 140H motor grader leveling an industrial platform

    Stage 02

    Excavation and pads

    Cuts, fills and lab-controlled compaction.

    What happens

    Excavators and trucks perform cuts and hauls; embankments are built and compacted in layers with controlled moisture and density tests. In urban areas deep excavation is protected with retaining walls and, if needed, groundwater pumping.

    Deliverables

    • Pad at design level
    • Compaction tests per layer
    • Weekly report of cubic meters moved

    Who takes part

    • Excavator, roller and dump-truck operators
    • Quality-control lab
    • Resident engineer and survey

    Typical time

    Weeks; depends on volume, work fronts and haul distance. · General range; depends on scope.

    Real data Torre Altra: excavation, sludge removal and groundwater pumping for Foinversión.

    Services:Earthworks & site grading Deep excavation, foundations & structure

  3. Reinforcing steel grid for a foundation slab

    Stage 03

    Foundations

    Shallow and deep foundations designed for industrial loads.

    What happens

    With the soil study and structural design we place blinding, rebar, formwork and pours of footings, pedestals, grade beams, mats or piers. Every pour sends concrete samples to the lab.

    Deliverables

    • Poured and leveled foundations
    • Concrete strength tests
    • Foundation as-built drawings

    Who takes part

    • Rebar, formwork and concrete crews
    • Project structural engineer
    • Resident engineer and lab

    Typical time

    Weeks to months, depending on area and foundation type. · General range; depends on scope.

    Real data Building foundations at Capithal Park (Zapopan) and Almer (Guadalajara).

    Services:Deep excavation, foundations & structure Industrial buildings (turnkey)

  4. Reinforced column over a poured footing

    Stage 04

    Structure

    Steel or concrete structure, certified erection. Buildings from 3,750 to 40,023 m².

    What happens

    Columns, trusses, purlins and bracing are erected, or columns, walls and slabs are poured. Plumb, levels and bolt torques are verified before closing the envelope.

    Deliverables

    • Erected and verified structure
    • Erection reports and tests

    Who takes part

    • Erectors and crane
    • Structural supervision
    • Resident engineer

    Typical time

    Weeks to months, depending on spans, height and area. · General range; depends on scope.

    Real data 40,023 m² for Industrializadora de Mantecas (Amatitán).

    Services:Industrial buildings (turnkey) Deep excavation, foundations & structure

  5. Crew pouring concrete from a mixer truck on an industrial platform

    Stage 05

    Envelope

    Roofing and walls that meet thermal and schedule targets.

    What happens

    The building is closed: roofing, walls (metal panel, tilt-up or block), skylights, dock doors and glazing. The industrial floor is poured and finished for the operating load.

    Deliverables

    • Weather-tight building
    • Finished industrial floor

    Who takes part

    • Roofing, wall and floor crews
    • Resident engineer

    Typical time

    Weeks, depending on area and building system. · General range; depends on scope.

    Real data Production and warehouse buildings for Oleofinos (16,730 m²) and Kervo (9,160 m²).

    Services:Industrial buildings (turnkey) Commercial & residential construction

  6. Steel structure of a warehouse being erected on the platform

    Stage 06

    MEP

    Electrical, plumbing, fire protection and special systems, coordinated.

    What happens

    Electrical, plumbing, fire-protection and process systems are installed and tested; in land development, water and sewer networks with manholes and valve boxes.

    Deliverables

    • Tested installations
    • Hydrostatic and electrical tests
    • MEP as-built drawings

    Who takes part

    • Trade installers
    • MEP engineering
    • Resident engineer

    Typical time

    In parallel with envelope and finishes. · General range; depends on scope.

    Real data Fire-protection networks and treatment plants at Natura Tec and Dulces de la Rosa.

    Services:Land development & hydraulic infrastructure Industrial buildings (turnkey) Process plants & agro-industry

  7. Perimeter block wall at dusk

    Stage 07

    Finishes and site development

    Roads, utilities and site works that leave the park ready to operate.

    What happens

    Maneuvering yards, parking, concrete roads, sidewalks, lighting, landscaping and signage. In public works, safe crossings, accessibility and street furniture.

    Deliverables

    • Finished exteriors
    • Pavements with concrete tests

    Who takes part

    • Pavement and finish crews
    • Resident engineer

    Typical time

    Weeks, at the end of the project. · General range; depends on scope.

    Real data Providencia, Country Club and Valle Real: roads rebuilt after renewing utilities with SIAPA.

    Services:Land development & hydraulic infrastructure Public works & road maintenance

  8. Finished concrete roadway

    Stage 08

    Handover

    Turnkey delivery. On time.

    What happens

    Final tests, cleaning, as-built drawings, manuals and handover certificate. In public works, final payment estimate and close-out. The warranty runs per contract.

    Deliverables

    • Handover certificate
    • As-built drawings and manuals
    • Contractual warranty

    Who takes part

    • Management and resident engineer
    • Client and supervision

    Typical time

    At the end of the construction schedule. · General range; depends on scope.

    Real data +150,000 m² of industrial buildings, +47 projects delivered and +10 documented public contracts.

    Services:Industrial buildings (turnkey) Public works & road maintenance

Before and during construction: six commercial steps

The commercial method wrapped around the eight stages: how we go from a call to a delivered project.

  1. 01

    Free site visit

    We review your site or drawings and listen to the goal.

    48 h

  2. 02

    Itemized proposal

    Line-item budget, schedule and clear scope.

    5-10 days

  3. 03

    Design & permits

    Engineering and design; permits with the municipality and utilities.

    per scope

  4. 04

    Execution with resident engineer

    Own crews, own fleet, safety first.

    per schedule

  5. 05

    Supervision & weekly reports

    Physical-financial progress, photos and logbook.

    weekly

  6. 06

    Handover & warranty

    Testing, as-built drawings and after-sales.

    on time

Questions about the process

Start your project with a free site visit.

Within 48 hours we review your site or drawings and tell you where to start.