S.06 · Construction management, planning & engineering design
Construction supervision and engineering design
Project management, pre-investment studies and architectural, structural and MEP design for industrial buildings, office buildings and residential projects.
- Supervisión de naves, edificios administrativos y residencial de prestigio

- published projects
- 3
- m² in published projects
- 41,148
Who it is for
- 01
Companies that need a complete engineering design before tendering or building.
- 02
Developers requiring independent supervision of quality, cost and schedule.
- 03
Investors assessing the feasibility of a site or plant.
What's included
- Pre-investment and feasibility studies
- Architectural design
- Structural design
- MEP design
- Bill of quantities and base budget
- Technical and administrative construction supervision
- Quality control, payment estimates and logbook
OBRA VIVA
How we build it, stage by stage
Every service follows the OBRA VIVA method: eight stages with verifiable deliverables.
- Stage 01
Assessment
Site, regulations, space program and target budget.
- Stage 01
Schematic design
Siting alternatives and investment estimate.
- Stage 03
Construction documents
Architectural, structural and MEP drawings; bill of quantities and budget.
- Stage 04
Supervision
Supervision residency, quality control, payment estimates and reports.
- Stage 08
Close-out
Handover, as-built drawings and project file.
Tests and deliverables
- Complete construction documents by discipline
- Bill of quantities, budget and schedule
- Supervision and quality control reports
- Technical opinions, certificates and project file
Applicable regulations
- Building codes and technical standards applicable per municipality
- Official standards by discipline (electrical, hydraulic, safety)
- Contracting agency guidelines in public works
Projects in this service

Natura Tec industrial complex (phase 2)
Natura Tec (Italy)

10-house complex, Cooperativa Zapopan Tesistán
Cooperativa Zapopan Tesistán

Grupo Inmobiliario BAHE offices, parking, dock and warehouse
Grupo Inmobiliario BAHE
Related guides
6 min
REPSE and subcontracting: what to ask your contractor before signing
What changed with Mexico's subcontracting reform, what REPSE is, the IMSS, INFONAVIT and SAT obligations that come with it and the document checklist that protects whoever hires construction work.
8 min
Permits and licenses to build in Zapopan and the Guadalajara metro area
From land use to occupancy: the rulings, permits and feasibility approvals an industrial or commercial project needs in the Guadalajara metro area, the order in which to request them and how long they usually take.
6 min
How to choose a contractor for an industrial project in Jalisco
The criteria industrial buyers use, in order of weight: proven experience, compliance, safety, financial capacity, equipment, construction method and references. Plus the red flags to spot before signing.
Frequently asked questions
Complementary services
Quote this service with an engineer.
Free site visit within 48 hours and an itemized proposal with schedule.