Skip to content
Constructora Elite

S.02 · Earthworks & site grading

Earthworks and industrial pads in Guadalajara, Jalisco and the surrounding region

Clearing, cut and fill, grading, hauling and compaction with our own fleet for industrial parks, logistics centers, retail plazas and subdivisions.

  • Capithal Park
  • Almer-Icebox
  • Elite Aeropuerto
  • Centro Logístico de Jalisco
  • Ubika Mariano Otero y Boreales
CAT 140H motor grader leveling an industrial platform

Who it is for

  1. 01

    Industrial park and logistics developers who need several earthwork fronts at once.

  2. 02

    Contractors subcontracting earthworks, pads and hauling to a partner that arrives with equipment.

  3. 03

    Housing and retail developers starting from raw land.

What's included

  • Topographic survey and layout
  • Clearing and removal of topsoil or clay
  • Cuts and mass excavation
  • Fills and embankments compacted in layers
  • Sub-base and breaker-layer shaping
  • Grading of pads and roads
  • Hauling and material disposal
  • Compaction control with lab testing

OBRA VIVA

How we build it, stage by stage

Every service follows the OBRA VIVA method: eight stages with verifiable deliverables.

See the 8 stages
  1. Stage 01

    Layout and survey

    Survey, boundary and design levels; cut-and-fill quantities.

  2. Stage 01

    Clearing

    Removal of topsoil or unsuitable material and haul to an authorized site.

  3. Stage 02

    Cut and fill

    Mass excavation, embankment shaping and layer compaction.

  4. Stage 02

    Pad and sub-base

    Final grading, sub-base or breaker layer and compaction tests.

  5. Stage 08

    Handover with levels

    Topographic verification of levels and delivery of lab reports.

Indicative range

How much does it cost? Reference per unit

Levelper m³Example: 10,000 m³
StandardMX$60 – MX$250MX$600,000 – MX$2,500,000

Indicative, subject to engineering design and site visit. Direct cost in the Guadalajara metro area: excludes land, design, permits and VAT; a regional factor applies in the rest of Jalisco and in other states. Parameters version 2026.10. Machine excavation, cut and fill; rock and long hauls increase cost.

Calculate my range

Tests and deliverables

  • Cut, fill and haul quantities with cross sections
  • Schedule by work front
  • Weekly report of cubic meters moved
  • Compaction tests (Proctor) per layer
  • Final levels verified by survey

Applicable regulations

  • Project geotechnical study specifications
  • SCT (N·CMT) earthworks standards where applicable
  • Municipal and state rules for hauling and construction waste disposal
  • NOM-031-STPS (construction site safety)

Related guides

Frequently asked questions

Quote this service with an engineer.

Free site visit within 48 hours and an itemized proposal with schedule.

Get a quote